Поз.
Артикул
Описание
116
PANELLING930MM, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING ROOF HATCH 1351/666MM
116
PANELLING
116
PANELLING1351MM, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING649/683,3MM, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING ROOF HATCH
116
PANELLING EMERGENCY EXIT IN ROOF 1351/656, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING1117/666MM
116
PANELLING930/666MM, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING1117MM, TO BE ADAPTED DURING ASSEMBLY
116
PANELLING AIR CONDITIONER
116
PANELLING EMERGENCY EXIT IN ROOF 1351/656MM
116
PANELLING1351/666M
117
CLOSURE. FASTENER
117
LOCK AIR CONDITIONER
143
LEDGE PLASTIC 673,5MM, TO BE ADAPTED DURING ASSEMBLY
143
LEDGE PLASTIC 672MM, TO BE ADAPTED DURING ASSEMBLY
143
LEDGE ROOF HATCH 652,8MM
143
LEDGE652,8MM
146
RAIL666MM
146
LEDGE ALUMINUM
158
RUBBER SECTION , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
999
BRACKET EMERGENCY EXIT IN ROOF
999
BRACKET EMERGENCY EXIT IN ROOF
999
FLAP , NO.7C01I.......I.......I I II
999
LATCHTO A 000 988 56 60
999
FRAME TRANSVERSE DUCT,TOP
999
FRAME TRANSVERSE DUCT,BOTTOM