Поз.
Артикул
Описание
5
PANELLING PARCEL RACK,TOP
8
PANELLING PARCEL RACK,TOP
11
PANELLING PARCEL RACK,TOP
14
PANELLING PARCEL RACK,TOP
17
PANELLING PARCEL RACK,TOP
21
PANELLING PARCEL RACK,TOP
24
PANELLING PARCEL RACK,TOP
26
PANELLING PARCEL RACK,TOP
29
COVER PARCEL RACK,TOP
32
PANELLING PARCEL RACK,TOP
33
COVER PLATE
34
COVER PLATE
35
BAND SHAPED SPRING , AS OF PRODUCTION BREAKPOINT DATE 01.10.2007
38
FILLET RIGHT CONNECTOR
41
FILLET LEFT CONNECTOR
50
COVERING STAY 218MM, UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
50
COVERING357MM, UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
50
STANCHION
51
STANCHION218MM, TO BE ADAPTED DURING ASSEMBLY AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 26.01.2009
53
COVERING RIGHT, TO BE ADAPTED DURING ASSEMBLY UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
53
STANCHION LEFT
56
STANCHION RIGHT, AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 26.01.2009
56
COVERING LEFT, TO BE ADAPTED DURING ASSEMBLY UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
59
GRILLE VENTILATION SCREEN
66
COVERING
68
NUTM6
71
HEXALOBULAR BOLT BRACKET ON TUBULAR SUPPORTING FRAMEWORK M6X12
72
BRACKET VENTILATION SCREEN, AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 21.06.2010
73
BRACKET
74
FASTENING CLIP ROUND
76
RETAINING DISK
77
BRACKET VENTILATION SCREEN, AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 21.06.2010
77
BRACKET , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2010
82
BRACKET
86
RUBBER SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
88
COVER FLOOR LUGGAGE SHELF
90
COVER FLOOR LUGGAGE SHELF
91
PANELLING FLOOR LUGGAGE SHELF
92
COVER FLOOR LUGGAGE SHELF
93
COVER FLOOR LUGGAGE SHELF
94
COVER
95
COVER
96
COVER FLOOR LUGGAGE SHELF
97
COVER
125
RAIL FRONT 49MM
125
RAIL
900
TAPPING SCREW3,5X16MM
902
NUT BRACKET TO FIRE WALL
904
SCREW
906
HEXALOBULAR BOLT LINE MOUNTING M6X20