1. Главная
  2. Mercedes
  3. BUS
  4. O530 - CITARO 15M, 2-TUERER
  5. 628.187
  6. 68 COVERING AND LINING
  7. 270 FLOORING,FLOOR FLAPS IL. 4

Mercedes A6286800978 - ZB DECKEL OLA : A

O530 - CITARO 15M, 2-TUERER 628.187
68 COVERING AND LINING - 270 FLOORING,FLOOR FLAPS IL. 4
  • Поз.
    Артикул
    Описание
  • 95
    COVERING ENGINE MAINTENANCE,101354 ALSO INSTALLED ON 101259-101267,101283-101288,101295,101304,101306,101307,101310-101317,101319,101323-101348. EXCEPT FOR 101354-101358,101359,101360,300140-300144.
  • 95
    COVER , AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS)01.10.2008
  • 95
    COVER ENGINE MAINTENANCE,101354 ALSO INSTALLED ON 101259-101267,101283-101288,101295,101304,101306,101307,101310-101317,101319,101323-101348. EXCEPT FOR 101354-101358,101359,101360,300140-300144.
  • 95
    COVER , AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS)01.10.2008
  • 97
    INSULATION , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2008
  • 99
    DAMPING , TO BE ADAPTED DURING ASSEMBLY
  • 101
    CLAMPING DISC30X23X3,5X0,4MM
  • 103
    FASTENER COVERING TO FLOOR
  • 105
    SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 105
    SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 107
    ADHESIVE TAPE , ORDER BY THE METER
  • 107
    RUBBER SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 109
    NUTM10
  • 112
    SERVICING COVER , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2008
  • 112
    SERVICING COVER , AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS)01.10.2008
  • 114
    FASTENER COVERING TO FLOOR
  • 116
    DAMPING , TO BE ADAPTED DURING ASSEMBLY
  • 118
    SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 120
    ADHESIVE TAPE , ORDER BY THE METER
  • 122
    CLAMPING DISC30X23X3,5X0,4MM
  • 124
    NUTM10
  • 129
    COVER , AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS)01.10.2008
  • 129
    COVERING , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2008
  • 132
    FASTENER COVERING TO FLOOR
  • 135
    RUBBER SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 135
    ADHESIVE TAPE , ORDER BY THE METER
  • 138
    SEALING TAPE , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2008 ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
  • 141
    NUTM10
  • 144
    SEAL , ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
С любыми вопросами обращайтесь по телефонам
Ответим на Ваши вопросы по электронной почте [email protected]